EARLY CONTRACTOR INVOLVEMENT(ECI)
ECI refers to the practice of involving contractors in the planning and design phase of a construction project, typically before the final design and construction documents are completed.
ECI can be used in different procurement methods such as design-build, construction management and others.
Advantage of early contractor involvement
1. Cost savings: ECI allows the contractor to provide input on cost-saving measures and materials, and can also help to identify potential cost overruns. This can result in cost savings for the owner.
2. Improved schedule: Contractors can provide input on the feasibility of the project schedule and suggest potential changes to improve the schedule. This can result in a more realistic and achievable project schedule.
3. Quality improvement: ECI allows the contractor to bring their expertise and experience to the project, which can help to improve the overall quality of the project.
4. Risk management: ECI can help to identify and manage potential risks, such as safety hazards or scheduling conflicts. This can result in a safer and more efficient project.
5. Innovation: ECI encourages innovation and creativity which can lead to cost-effective and efficient solutions.
6. Better collaboration and teamwork: ECI helps owner creates a sense of collaboration and teamwork that can lead to a more successful project.
7. Improved contractor performance: ECI can improve their performance as they are already part of the team and their interest is aligned with the project success.
8. Reduced claims: ECI can reduce the number of claims that may arise during construction.
9. Better value for money: ECI helps owner can ensure that they are getting the best value for money, as the contractor's input can lead to cost savings and improved quality.
10. Better planning: Early contractor involvement allows the contractor to provide input on the design and planning of the project, which can lead to a more efficient and effective project.
-It's worth noting that early contractor involvement requires a level of trust, open communication, and willingness to collaborate from all parties involved, and clear understanding of the contractor's responsibilities and roles in the project.
Disadvantage of early contractor involvement
1. Increased coordination
2. Changes to project scope
3. Increased risk for the owner
4. Limited competition
5. Lack of design maturity
6. Limited design options
7. Dependence on contractor
8. Limited subcontractor involvement
9. Limited transparency
10. Limited flexibility
It's important to note that while there are potential disadvantages to ECI, it can still be a valuable approach when executed correctly and with proper oversight. It's important that the owner and the contractor have a clear understanding of the process and their roles and responsibilities in order to mitigate these disadvantages
Comentários